Designing
We kicked our solution designing into high gear. Both teams came up with some good designs built on experience and the desire to score points. We also got the test table built and set up in a spare room.
We built most of the volcano and tried it out thanks to Paul. See the video.
Advisors Status Opinion
Team 129 | The team is rather large, but many are not engaged. The documentation is started, but needs softcopy versions. |
Team 130 | The team is smaller and has much experience. The documentation is started, but needs softcopy versions. |
Team 130 making progress |
Navigation design |
Bot 1 tasks |
Bot 2 tasks |
Bot 2 side |
Bot 2 top |
Bot 2 back |
Planned scores |