Saturday, March 25, 2006 | Prev | Index | Next |
We had a small but determined group working on their bots. We decided that we need more time to work on them so some are coming in on Monday, March 27. We still have some weak areas of our documentation.
We did a lot of playing with the board. We believe the Botguy will drop most of the time on our side when you push on the hanging bar. This is the end of the second week.
Documentation Item (1st Period) |
Team A (Teams 1/2/5) |
Team B (Teams 3/4/6) |
Game Strategy | ||
Mechanical Design | ||
Software | ||
Team Organization | ||
Assignments | ||
Goals | ||
Milestones |
Team 1 Bot |
Team 3 Design |
Team 4 Treads |
Team 4 Bot |
Go little bot, pull the pipes |
Team 4 design |